Description
Design the HVAC system knowing the correct size required to serve your application to optimize energy and minimize costs. Heat load calculations and equipment sizing—Chiller, Pumps & AHUs.
Scope:
- Half-hour discovery session to understand the application.
- Consultant will analyze the information/data available and calculate the heat load.
- Consultant will determine the size of equipment based on the heat load.
- 1 to 2 half-hour sessions to deep dive into questions.
- Consultant will prepare the design document, including the equipment sizing.
Deliverables/Outputs:
- Design document with equipment sizing.
Timing:
- Project is expected to take 3-4 weeks to complete. A specific timeframe for execution will be agreed between Client and Consultant after purchase.
Assumptions:
- Client will provide a point of contact with project knowledge to answer questions.
- Client will provide required information such as application—comfort/process, layout, process/equipment details, occupancy, operating hours, MOC details, etc.
- Site visit may be required. Traveling and lodging costs will be billed separately.
- Includes one round of revision based on Client feedback.
- Client will provide constructive feedback and guidance in reviews.
- Client will review & accept deliverables within seven days of final submission.
- Out-of-scope or additional requests will require a separate engagement.